时间:2023-07-13 09:04:43人气:6998来源: chinadaily.com.cn
The northern section of the Beijing Metro Line 17 has started its debugging, and it is expected to go into no-load operation in the third quarter and become operational by the end of this year.
With a total length of 49.97 kilometers and 21 stations, Beijing Metro Line 17 is fully underground and runs through four districts: Dongcheng, Chaoyang, Changping and Tongzhou.
The southern section of Line 17 went into operation at the end of 2021. The northern section spans 26.3 kilometers and has 10 stations. With eight-car type A trainsets, maximum speed can reach 100 kilometers per hour.
As the new line goes into operation, it is expected to ease passenger traffic pressure from Lines 5 and 13, further improving rail transit service in the Future Science City area, Huilongguan and Tiantongyuan neighborhoods in Changping district.
This year, Beijing will continue construction on 11 rail transit lines with total length of 231.3 kilometers, said Yang Liming, director of the No 1 department of rail transit under the Beijing Major Projects Construction Headquarters Office.
As the northern section of Line 17 and the remainder of Line 16 go into operation, Beijing's metro network will exceed 837 kilometers in length by the end of this year.
China urges the U.S. to lift sanctions on firms, vows to defend interests
(5993)人喜欢2025-10-11Three scientists share Nobel Prize in Medicine for discoveries concerning peripheral immune tolerance
(5997)人喜欢2025-10-07China to launch K visa for young science, tech professionals
(6000)人喜欢2025-10-02Zheng Qinwen returns from injury as No. 7 seed for China Open
(4012)人喜欢2025-09-25Guiyang launches direct flight to Seoul amid tourism push
(6013)人喜欢2025-09-19Remains of 30 Chinese martyrs in Korean War returned to China
(6013)人喜欢2025-09-14Sino-Russian film 'Red Silk' to hit Chinese theaters
(6018)人喜欢2025-09-0626 foreign leaders to attend China's V-Day commemorations on Sept. 3
(4510)人喜欢2025-08-29